{"id":107507,"date":"2024-09-26T09:18:04","date_gmt":"2024-09-26T13:18:04","guid":{"rendered":"https:\/\/\/?p=107507"},"modified":"2024-09-26T09:18:04","modified_gmt":"2024-09-26T13:18:04","slug":"first-solar-opens-3-5-gw-solar-panel-factory-in-alabama","status":"publish","type":"post","link":"https:\/\/\/2024\/09\/first-solar-opens-3-5-gw-solar-panel-factory-in-alabama\/","title":{"rendered":"First Solar opens 3.5-GW solar panel factory in Alabama"},"content":{"rendered":"
First Solar has held the grand-opening of its new 3.5-GW solar panel manufacturing facility in Lawrence County, Alabama. The $1.1 billion fully vertically integrated thin-film solar manufacturing facility is First Solar’s first U.S. factory<\/a> outside of Ohio. Once ramped to full capacity, the site should support 800 jobs.<\/p>\n